The product well displays environmental protection and energy saving.
Overview
Quick Details
- Applicable Industries:
-
Manufacturing Plant, Machinery Repair Shops, Food & Beverage Factory, farms
- Place of Origin:Zhejiang, China
- Brand Name:
-
OEM
- Output Torque:
-
19~2371
- Input Speed:
-
1400RPM
- Output Speed:
-
24~140
- Ratio:
-
10,15,20,25,30,40,50,60
A power take-off or power takeoff (PTO) is any of several methods for taking power from a power source, such as a running engine, and transmitting it to an application such as an attached implement or separate machine.
- Housing material:
-
Die-Cast Iron cast
- IEC Flange:
-
56B5,63B5,71B5,80B5,90B5,100B5,132B5,160B5
Supply Ability
- Supply Ability:
- 1200 Unit/Units per Month
Packaging & Delivery
- Packaging Details
- Wooden case per pc + many pcs in big wooden case
- Port
- Shanghai/Ningbo Port
-
Lead Time
: -
Quantity(Boxes) 1 – 1 >1 Est. Time(days) 25 To be negotiated
Online Customization
Product Description
WPDS worm gearbox worm gear speed reducer worm gear for servo motor inline reverse gearbox daftar harga gearbox
Company Information
Quality control
Packing&Delivery
Packing Details: Standard carton/Pallet/Standard wooden case
Delivery Details : 15-30 working days upon payment
Our Certifications
Related Product
FAQ
1.Payment Term: TT, L/C
2.Delivery time: about 30 days from receive payment.
3.We accept customized products as per your special requirement.
4.Guidelines for the Selection:Usually we can select one machine which is suitable for you with some informations from you,such as ratio/motor speed/mounting dimension/ out torque etc.
5.If the minimum order amount is in excess of $10000, there are preferential.
Q1: What information should I tell you to confirm the product?
A:Model/Size, Transmission Ratio, Shaft directions & Order quantity.
Q2: What can i do if I don’t know which one I need?
A:Dont worry, Send as much information as you can, our team will help you find the right one you are looking for.
Q3: What is your product warranty period?
A:We offer one year warranty since the vessel departure date left China.
Q4: Are you trading company or manufacturer ?
A: We are factory.
Q5: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q6: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q7: What is your terms of payment ?
A: Payment=1000USD, 30% T/T in advance ,balance before shippment.
If you have any other questions, please feel free to contact us as shown below, you can click on the image below to contact me directly.
Contact Us
Assembly position In order to set up a gear reducer and to make it work efficiently, the following instructions must be taken into account: